Readiness Dashboard
The readiness dashboard shows your IRAP compliance posture at a glance. Use it to track progress and identify which areas need attention.
Overall Readiness Score
- A meter showing the percentage (0–100%), with "N of M applicable controls compliant" beneath it
- Calculated as: compliant controls / applicable controls
- Colour coded: green (80% or more), amber (50–79%), red (below 50%). When no applicable control has been assessed yet, it reads "Not assessed" instead of a percentage
Note: Controls marked "Not Applicable" are excluded. Make sure applicability determinations are accurate.
Readiness is calculated live from your current control statuses, so a status change, an SOA import or a new AI assessment shows the next time the page loads. The dashboard, the framework list, this page, the Essential Eight view, reports and the MCP server all use the same figures.
- Only compliant controls count towards the percentage. Partially compliant controls count as 0 and are shown as their own band.
- A status you set overrides the AI assessment. Where you have not set one, the AI assessment is used.
- Gaps are partially compliant plus non-compliant controls.
- The readiness trend records a point every day, and after every status change or SOA import.
Statistics
The tiles are labelled Applicable, Compliant, Partial, Non-compliant and Not Assessed.
| Metric | What it means |
|---|---|
| Applicable | Controls that apply to your environment |
| Compliant | Controls fully implemented with evidence |
| Partial (partially compliant) | Controls with incomplete implementation, and controls the AI marked Needs review |
| Non-compliant | Controls not yet implemented |
| Not assessed | Controls not yet reviewed |
Evidence Coverage
Below the tiles, a meter shows how many applicable controls have linked evidence, and when the last compliance assessment ran.
Topic Coverage
- Colour-coded cards for each ISM topic area
- Sorted worst-first so you focus on biggest gaps
- Each card shows a breakdown bar (green/amber/red/grey)
- Click a topic card to open the controls for that topic in the control catalogue
Tip: Focus on red topics first. Addressing the lowest-scoring topics will have the biggest impact on your overall readiness.
Preparing for Assessment
- Address non-compliant controls first (biggest gaps)
- Review partially compliant controls for remaining work
- Ensure "Not assessed" controls are evaluated
- Verify evidence is fresh (< 60 days) for compliant controls
- Generate the SOA report when the readiness score is acceptable (Generate Report under Quick Actions on this tab)